How to maintain electroplating equipment daily
Time:2023-12-08

Electroplating equipment production lines occupy a large share in printed circuit board manufacturing enterprises. In order to ensure the normal operation of the electroplating equipment, the stability of the operation process and the service life of the electroplating equipment, the correct protection and maintenance of the equipment is very important. So, electroplating equipment manufacturers tell you why protection is important?

1. Protection and maintenance of the circulating system filter system 7d once check the filter element of the circulating system filter system to see if it leaks. Clean or replace the filter core every 10-15 days.

2. Protection of the linear plating line and protection of the linear plating line use brackets and expanders to transfer the substrate. Clean the crane and spanners once a week (do not remove the car and spanners), adhere to the clean appearance, clean with a rag, and sand with sandpaper.

3. Protection and maintenance of conveyors in horizontal electroplating production lines The conveying equipment used in horizontal electroplating production lines is the drum, which uses the rotation of the drum to continuously feed the circuit board into each slot. Therefore, the protection of the transport equipment of the horizontal hanging plating production line is different from that of the linear plating production line.

The drums of the horizontal plating line should be sorted once for 7 days to remove dirt adhering to the drums and ensure that the surface of the conveyor plate is clean. Check that the crankshaft is down.

4. The protection and maintenance of the vibration tissue on the linear electroplating production line should be carried out on the linear electroplating. In order to ensure the uniformity of the exterior copper and the effect of the hole copper during the copper plating process, the plate will vibrate and shake, and the tank will be set to vibrate and shake the structure. Check the reducer for 30 days to see if it works normally and check its tightness; Check the fastening of the bolts installed on the motor; Check the wear of anti-vibration rubber and replace it in time if it is serious. Check the contact of power cables in the 180d junction box. When the terminal is loose, tighten it immediately. For power cables with melted or aged insulation layers, replace the power cables to ensure insulation between them.

5. Protection and maintenance of other parts 7d. It is necessary to check the output power of the power supply twice; Check the heat dissipation devices and radiators commonly used in power supplies and electrical control devices, remove dust, and clean them to prevent heat dissipation. Check all connectors, timely repair poor contact, virtual connection and virtual welding, and timely replacement in case of corrosion damage; Check all contactors and relays. If the contact is poor or stuck, please replace it in time; Check the main parameters of capacitors, reactors, resistors and other parts. If abnormal, replace as soon as possible.

6. The main difference between the protection of the storage tank and the straight plating line and the horizontal plating line is that the method of transporting the circuit board is different. Tank protection and protection methods actually vary greatly. Within 7 days, each cleaning tank should be cleaned once, and the acid cleaning tank should be cleaned once, and then the tank liquid should be removed and replaced. Check whether the automatic water spraying device in the storage tank is blocked and pass the blockage immediately.

For the conductive support on the copper and tin plating solution and the contact between the anode and the induction power transmission line, wipe once with a towel and sandpaper. Check the titanium and tin baskets of the copper plating tank and tin plating tank, replace the rotten titanium basket bags and tin baskets, add the copper ball and tin rod, add the copper ball and tin rod after 7 days, electrolytic copper plating tank and electroplating tin bath.

主站蜘蛛池模板: 欧美在线视频一区二区 | 成人免费黄色大片 | av在现观看 | 久久国产v| 先锋影音av在线资源 | 久久99久久精品久久久久久 | 视频福利网 | 国产精品免费一区二区三区四区 | 色妞欧美日韩在线 | 天堂一区av| 欧美二区三区 | sese在线观看| 被陌生人带去卫生间啪到腿软 | 久久综合国产伦精品免费 | 挺进老师嫩嫩嫩的身体视频 | 国产亚洲人成无码网在线观看 | 中日韩黄色大片 | 国产高清福利无码视频 | 91精品福利在线观看 | 青草啪啪| 夜夜夜久久久 | 中文乱码字幕无线观看 | jizzjizz国产在线观看 | 成人午夜精品久久久久久久 | 韩日精品视频在线观看 | 日本一区二区福利视频 | 中华成人网 | 大帝a∨无码视频在线播放 国产在线导航 | 国产精品欧美久久久久一区二区 | 影音先锋国产精品 | 亚洲欧美成人一区二区在线电影 | 日日夜操 | 亚洲精品v日韩精品 | 成人在线播放av | 亚洲国产理论片在线播放 | 日韩在线色视频 | 免费观看av的网站 | 一级全黄60分钟在线视频 | 国产传媒一区二区 | 武则天裸体扒开腿让我桶 | 国产三级中文 |